Mariner Beach Club
BillerReinhart Structural Group, Inc. prepared design drawings and specifications and bid documents for the exterior renovation and restoration of the two 2-story timeshare buildings.
View Project
|
 |
|
|
Adams Mark Hotel
BillerReinhart Structural Group, Inc. prepared design drawings and specifications and bid documents for the restoration of deteriorated reinforced concrete balconies for the 16-story south tower
View Project
|
 |
|
|
Hilton Downtown Miami
BillerReinhart Structural Group, Inc. prepared design drawings and specifications and bid documents for the restoration, waterproofing, and re-coating of the 25-story hotel structure.
View Project
|
 |
|
|
Grand Hyatt Tampa Bay
BillerReinhart Structural Group, Inc. performed structural design and prepared construction documents (drawings and specifications) for various renovation and restoration projects at the hotel complex
View Project
|
 |
|
|
Discovery Cove
BillerReinhart Structural Group, Inc. performed threshold inspection services to observe construction progress on the new Discovery Cove park expansion.
View Project
|
 |
|
|
Coral Reef Beach Resort
BillerReinhart Structural Group, Inc. performed structural restoration analysis services to replace the 5th level elevated walkway that was severely damaged at the five-story building.
View Project
|
 |
|
|
Rockville Doubletree Hotel
BillerReinhart Structural Group, Inc. prepared design drawings and specifications and bid documents for the restoration and partial removal and replacement of deteriorated reinforced concrete
View Project
|
 |
|
|
Holiday Inn Peoria City Centre
BillerReinhart Structural Group, Inc. prepared design drawings and specifications and bid documents for the exterior painting and waterproofing of the hotel structure.
View Project
|
 |
|
|
Holiday Inn
BillerReinhart Structural Group, Inc. performed Threshold Inspector duties as per Chapters 471 and 553 of the Florida Statutes for the five-story hotel building.
View Project
|
 |
|
|
Garden Grille - Lowry Park Zoo
BillerReinhart Structural Group, Inc. performed structural design for a one-story restaurant expansion (Garden Grille).
View Project
|
 |
|
|
Clearwater Marina
BillerReinhart Structural Group, Inc. performed a feasibility study to verify that the structure of the second floor, of the Clearwater Marina Building, has the capacity to accommodate restaurant occupancy load per the current building code requirements and can support various equipment that will be used for the restaurant being proposed.
View Project
|
 |
|
|
Coconut Grove Doubletree Hotel
BillerReinhart Structural Group, Inc. prepared design drawings and specifications and bid documents for the restoration of deteriorated reinforced concrete parking deck slabs, retaining walls
View Project
|
 |
|
|
Darden Restaurant Support Center
BillerReinhart Structural Group, Inc. performed structural analysis for multiple steel stair systems.
View Project
|
 |
|
|
Embassy Suites
BillerReinhart Structural Group, Inc. performed Threshold Inspector duties as per Chapters 471 and 553 of the Florida Statutes for the 113,000 square foot five-story hotel building.
View Project
|
 |
|
|
Homewood Suites
BillerReinhart Structural Group, Inc. performed Threshold Inspector duties as per Chapters 471 and 553 of the Florida Statutes for the 98,000 square foot seven-story hotel building.
View Project
|
 |
|
|
Oceanfront Hotel/Courtyard by Marriott
BillerReinhart Structural Group, Inc. prepared design drawings and specifications for the renovation and restoration of this thirteen story hotel structure.
View Project
|
 |
|
|
Springhill Suites
BillerReinhart Structural Group, Inc. performed Threshold Inspector duties as per Chapters 471 and 553 of the Florida Statutes for the 70,000 square foot six-story hotel building.
View Project
|
 |
|
|
Steak
BillerReinhart Structural Group, Inc. performed structural design for prototype buildings. Structures were designed for a location-appropriate wind speeds.
View Project
|
 |