BillerReinhart Structural Group, Inc. performed a condition survey of discernible structure elements of the existing supports for the manually-operated elevator.
BillerReinhart performed structural design and prepared construction documents (drawings and specifications) for modifications and structural strengthening of the elevator shaft to support the new elevator equipment.
Printable Portfolio Page |
PROJECT SIZE
Elevator Replacement for 9-Story Building