Home About Us Our Services Portfolio Client Testimonials Career Opportunities Contact Us  
 
Art Installation
Commercial
Healthcare
Hotels & Hospitality
Industrial & Manufacturing
Parking Structures
Public
Religious
Residential
Water & Wastewater
 
Tampa Location:
4014 Gunn Highway
Suite 248
Tampa, FL 33618
Phone: 813-908-7203
Fax: 813-908-7303
info@billerreinhart.com


 
title
Van Wezel Performing Arts Center

Biller Reinhart Structural Group, Inc.  provided structural engineering design and renovation for the removal of the existing hydraulic orchestra lift and replacement with electric lifting mechanisms.  The new lifting mechanisms employ a coiled, flexible flat steel spring that expands with the insertion of a thin vertically oriented spiral steel band.  The result is a fully rigid column formed of continuous integrated I-shaped sections.  Other structural elements required for the installation of the new lift system included shoring of the existing lift framing structure, mounting plates and concrete footings to support the new lifts, reinforcing of the existing guide system, and validation of the lift framing structure for imposed loadings.   


Printable Portfolio Page |

PROJECT SIZE
Main Stage Orchestra Lift

EST. CONSTRUCTION COSTS
Budget $200,000
Actual $200,000

COMPLETION DATE
Sept. 2008

CLIENT
Information Available Upon Request

OWNER
Information Available Upon Request

Home | About Us | Our Services | Portfolio | Client Testimonials | Career Opportunities | Contact Us
© Copyright 2008 BillerReinhart Structural Group Inc. All rights reserved. Site By Team Lightning.
Share/Bookmark