|
Monsignor Lara Parish Youth Center
BillerReinhart Structural Group, Inc. performed Threshold Inspector duties as per Chapters 471 and 553 of the Florida Statutes for the 15,000 square foot gymnasium structure comprised of shallow foundations, reinforced masonry walls and pre-engineered metal building superstructure, 4000 square foot structural steel framed second level and 1000 square foot basement during construction.
View Project
|