Coca-Cola Conti Mix Room
Coca-Cola Conti Mix Room
Coca-Cola Conti Mix Room
Coca-Cola Conti Mix Room

Project details

  • Project Size: Tunnel Approximately 4' by 4'
  • Project Location: Holiday, Florida
  • Completion Date: 2011
  • Client: Information Available Upon Request
  • Owner: Information Available Upon Request

Coca-Cola Conti Mix Room

Biller Reinhart Engineering Group, Inc. performed a structural analysis of the concrete slab on grade and designed tunnel shoring for drainage repairs. BillerReinhart reviewed the provided proposed repair layout drawings and performed calculations as required to estimate the capacity of the slab on grade in the Conti Mix Room and as required for the design of the tunnel shoring. BillerReinhart also prepared drawings for the tunnel shoring described above.