Deland Waste Water Treatment Plant
Deland Waste Water Treatment Plant
Deland Waste Water Treatment Plant
Deland Waste Water Treatment Plant
Deland Waste Water Treatment Plant
Deland Waste Water Treatment Plant

Project details

  • Project Size: Facility
  • Project Location: Deland, Florida
  • Budgeted Construction Costs: $100,000
  • Actual Construction Costs: $100,000
  • Completion Date: 2010
  • Client: Information Available Upon Request
  • Owner: Information Available Upon Request

Deland Waste Water Treatment Plant

Biller Reinhart Engineering Group, Inc. performed a structural analysis to provide repair specification and detail alternatives which properly address the significant corrosion that has adversely affected some of the steel columns, base plates, anchor bolts and wall girts of the building. BillerReinhart reviewed the existing as-built structural drawings for the Sludge Process Building, performed calculations as required for the design of repair details which properly address the damaged structural steel elements, and prepared a Project Manual for the restoration of the structural steel columns, base plates and anchor bolts, as well as the horizontal wall girts, for the Sludge Process Building containing specifications and required construction details. BillerReinhart also attended a project meeting at the site to define the project scope and discuss the Project Manual.