  • Project Size: Curb and slab detail & heavy-duty trench area
  • Project Location: Fort Leavenworth, Kansas
  • Budgeted Construction Costs: $550,000
  • Actual Construction Costs: $550,000
  • Completion Date: 2010
  • Client: Information Available Upon Request
  • Owner: Information Available Upon Request

Fort Leavenworth Truck Fill Stand

Biller Reinhart Engineering Group, Inc. performed structural design services required for the new pantograph fill stand, pipe bollards, remote concrete containment basin with pump, containment drain system and concrete pavement removal and replacement. BillerReinhart reviewed information and performed calculations for the structural design of the remote spill containment basin. BillerReinhart designed new curb and slab detail for the new containment area (approximately 4′-6″ by 21′-0″) and they designed a new 12″x24″ heavy-duty trench drain area with the 6-inch ductile iron drain line within the existing containment area. BillerReinhart prepared construction documents (drawings and specifications) for the structural elements listed above.