Hilton Downtown Miami

Hilton Downtown Miami
Hilton Downtown Miami
Hilton Downtown Miami
Hilton Downtown Miami

Biller Reinhart Engineering Group, Inc. prepared design drawings and specifications and bid documents for the restoration, waterproofing, and re-coating of the 25-story hotel structure. Biller Reinhart assisted the client and owner during the bidding phase of the project to select a contractor to perform the restoration work.

Project details

  • Project Size: 25-Story Hotel Structure
  • Project Location: Miami, Florida
  • Budgeted Construction Costs: $1,000,000
  • Actual Construction Costs: $1,000,000
  • Completion Date: 2009
  • Client: Information Available Upon Request
  • Owner: Information Available Upon Request