Project details

  • Project Size: Master Lift Stations 12A & 27A
  • Project Location: Manatee County, Florida
  • Budgeted Construction Costs: $1,500,000
  • Actual Construction Costs: $1,500,000
  • Completion Date: 2005
  • Client: Information Available Upon Request
  • Owner: Information Available Upon Request

Manatee County Lift Stations

Biller Reinhart Engineering Group, Inc. provided structural engineering services for Master Lift Stations 12A and 27A in Manatee County, Florida. The lift stations were upgraded to increase the efficiency of the systems. The upgrades included replacing eddy current motors with variable speed drives; replacing the existing centrifugal pumps with submersible dry pit pumps; modifying the buildings to accommodate bridge cranes in the drywell for pump removal; installing flow meters; replacing existing valves and piping; modifying the MCC lineup; and providing process and instrumentation diagrams.