Old City Hall Elevator Shaft
Old City Hall Elevator Shaft

Project details

  • Project Size: Elevator Replacement for 9-Story Building
  • Project Location: Tampa, Florida
  • Budgeted Construction Costs: Pending
  • Completion Date: Pending
  • Client: Information Available Upon Request
  • Owner: City of Tampa

Old City Hall Elevator Shaft

Biller Reinhart Engineering Group, Inc. performed a condition survey of discernible structure elements of the existing supports for the manually-operated elevator. BillerReinhart performed structural design and prepared construction documents (drawings and specifications) for modifications and structural strengthening of the elevator shaft to support the new elevator equipment.