Springhill Suites Tampa/Brandon
Springhill Suites Tampa/Brandon

Project details

  • Project Size: 70,000 Sq. Ft.
  • Project Location: Brandon, Florida
  • Budgeted Construction Costs: $3,000,000
  • Actual Construction Costs: $3,000,000
  • Completion Date: 2007
  • Client: Information Available Upon Request
  • Owner: Information Available Upon Request

Springhill Suites Tampa/Brandon

Biller Reinhart Engineering Group, Inc. performed Threshold Inspector duties as per Chapters 471 and 553 of the Florida Statute s for the 70,000 square foot 6-story hotel building. The structure consists of cast-in-place concrete foundations and floor slab on grade, reinforced concrete masonry unit walls, and pre-cast pre-stressed hollow core concrete floor and roof slabs. BillerReinhart reviewed structural drawings, specifications, and submittals, performed site visits to observe project construction, and prepared reports documenting the work to the building code official having jurisdiction over the project.