Discovery Cove
Discovery Cove
Discovery Cove
Discovery Cove
Discovery Cove
Discovery Cove

Project details

  • Project Size: 875,000 Gallon Saltwater Reef Experience
  • Project Location: Orlando, Florida
  • Completion Date: 2011
  • Client: Information Available Upon Request
  • Owner: Information Available Upon Request

Discovery Cove

Biller Reinhart Engineering Group, Inc. performed threshold inspection services to observe construction progress on the new Discovery Cove park expansion. BillerReinhart also reviewed the permitted construction documents (drawings and specifications), shop drawings, shoring drawings, concrete mix designs, materials testing reports and geotechnical reports for this project.

BillerReinhart performed periodic site visits to observe project construction (during structural component construction) and prepared Threshold Inspection Summary Reports based on the daily field inspection reports by the threshold agent.