Tampa Location:
3434 Colwell Ave., Suite 100
Tampa, FL 33614
Phone: 813-908-7203
Fax: 813-931-5200
info@billerreinhart.com
Ft. Lauderdale Location:
7450 Griffin Road, Suite 110
Davie, FL 33314
Phone: 954-351-9006
Fax: 954-351-9009
info@billerreinhart.com
Lakeland Location:
4175 S. Pipkin Road, Suite 106
Lakeland, FL 33811
Phone: 863-226-0612
Fax: 863-226-1705
info@billerreinhart.com
St. Petersburg Location:
721 1st Ave. N., Suite 100
St. Petersburg, FL 33701
Phone: 727-408-6532
Fax: 727-408-6533
info@billerreinhart.com

News & Updates
Subscribe to our Newsletter
Request Proposal

BBB A+ Accredited Business
Water & Wastewater

Deland Waste Water Treatment Plant   Deland Waste Water Treatment Plant
Biller Reinhart Engineering Group, Inc. performed a structural analysis to provide repair specification and detail alternatives which properly address the significant corrosion that has adversely affected some of the steel columns, base plates, anchor bolts and wall girts of the building.


Hillsborough River Dam   Hillsborough River Dam
BillerReinhart performed structural engineering restoration services for the Hillsborough River dam walkway which evidenced deteriorated concrete and damaged steel girders.


Krause Pumping Station   Krause Pumping Station
Biller Reinhart Engineering Group, Inc. performed structural design and consultation services for the rehabilitation of Krause Pumping Station in downtown Tampa.


Manatee County Lift Stations   Manatee County Lift Stations
Biller Reinhart Engineering Group, Inc. provided structural engineering services for Master Lift Stations 12A and 27A in Manatee County, Florida.


Ocala National Forest Box Culvert   Ocala National Forest Box Culvert
Biller Reinhart Engineering Group, Inc. performed structural design services to repair drainage piping and a roadway that was washed away after a tropical storm event last year.


Volusia County Prision   Volusia County Prision
Biller Reinhart Engineering Group, Inc. performed structural engineering analysis services for the installation of a reinforced concrete slab on grade for a tank bottom without inducing significant stresses into the existing tank foundation ring wall to replace a ruptured liner.


Waste Water Reclamation Facility   Waste Water Reclamation Facility
Biller Reinhart Engineering Group, Inc. performed a structural analysis to explore the structural building modifications required to strengthen the BioSolids and adjacent pump building (located at the above captioned address) to withstand a Category Three hurricane with sustained maximum winds of 130 mph per the Saffir-Simpson Hurricane Wind Scale.